Source Documents
These are the council documents used to build the AC calculator. If a link is broken, the document may have moved on the council website.
GD01 Stormwater Management Devices (Dec 2025) + Auckland Unitary Plan E10
AC Stormwater Information Page
Calculation Methodology
Design event: 10-year ARI (Annual Recurrence Interval)
Retention
5mm runoff depth x impervious area
Method
SMAF area-based calculation (GD01 Section B1.7.1.1). Retention = 5mm depth x impervious. Detention = 18.5mm x impervious area. 24-hour drain-down. Resource consent required in SMAF areas.
Design Requirements
- SMAF1/SMAF2 overlay check required (Auckland Unitary Plan maps)
- Retention: min 5mm runoff depth for impervious area
- Detention: 24-hour drain-down period
- Min 1,000L detention-only tank; min 4,500L dual-purpose tank
- Resource consent required in SMAF areas (over 50m2 new impervious)
- Design per GD01 + TP108 methodology
Submission
Last verified: March 2026 - NZ Detention Tank Calculator