← Back to Calculator

Invercargill City Council

Stormwater Detention & Retention Requirements

Southland Region

Source Documents

These are the council documents used to build the ICC calculator. If a link is broken, the document may have moved on the council website.

Calculation Methodology

Design event: 10-year (10% AEP)

Method: Site-Specific Design

Current Code of Practice for Land Development (2016) applies. A joint Code of Practice with Southland District Council is under development.

Design Requirements

  • 2016 Code of Practice compliance
  • Joint CoP with Southland DC under consultation

Submission

Required Documents

  • Stormwater design report
  • Engineering plans

Contact

Phone(03) 211 1777
RegionSouthland
← Open Calculator for ICC

Last verified: April 2026 · NZ Detention Tank Calculator