← Back to Calculator

Waitaki District Council

Stormwater Detention & Retention Requirements

Otago/Canterbury Region

Source Documents

These are the council documents used to build the WDC calculator. If a link is broken, the document may have moved on the council website.

📄
APP1 - Stormwater Tanks on Private Property - Accepted Solutions
PDF Primary Source
🌐
WDC Stormwater Information Page
Council website - may contain updated links if documents above have moved.

Calculation Methodology

Design event: 10-year ARI (Annual Recurrence Interval)

Retention

None - detention only system

Method

Table lookup. 3 rows covering 0-249m2 roof. Detention only, no retention/reuse. Dual orifice (12mm low + 25mm high).

Design Requirements

  • Tank must be above ground
  • Min 80% of roof runoff diverted to tank
  • Max 50% impervious site coverage
  • Min 20-year manufacturer warranty
  • Overflow must NOT connect directly to stormwater system
  • Impervious area 30m2 or less exempt from hydraulic neutrality

Submission

CouncilWaitaki District Council
RegionOtago/Canterbury
← Open Calculator for WDC

Last verified: March 2026 - NZ Detention Tank Calculator