← Back to Calculator

Wellington Water (5 Councils)

Stormwater Detention & Retention Requirements

Wellington Region

Source Documents

These are the council documents used to build the WW calculator. If a link is broken, the document may have moved on the council website.

📄
Managing Stormwater Runoff Version 5 (March 2024)
PDF Primary Source
🌐
WW Stormwater Information Page
Council website - may contain updated links if documents above have moved.

Calculation Methodology

Design event: 10-year ARI (Annual Recurrence Interval)

Retention

Emergency water supply in lower tank (15-25% of volume)

Method

Approved Solution #1 - Rainwater Tank. Min 80% of new roof area diverted to tank. Covers Upper Hutt, Hutt City, Porirua, Wellington City, and South Wairarapa.

Design Requirements

  • Min 80% of new roof areas diverted to tank
  • Overflow must NOT connect to main stormwater system
  • Overflow to visible overland flow path
  • Leaf litter/debris diverter required
  • Tank bottom max 0.5m above ground (avoids building consent)
  • Emergency water supply in lower tank

Submission

CouncilWellington Water (5 Councils)
RegionWellington
← Open Calculator for WW

Last verified: March 2026 - NZ Detention Tank Calculator